模具整體結(jié)構(gòu)比較簡單,并且內(nèi)、外模的設(shè)計更容易讓施工的時候更容易進行脫模,整個模具經(jīng)久耐
用。產(chǎn)品的澆筑生產(chǎn)一般采用的是現(xiàn)澆的方式,在施工的時候需要先在地上挖一個足以盛下模具的大
坑,然后將模具在坑中拼接組裝好后澆筑進混凝土漿料。一般模具之間為了保證內(nèi)、外模的距離一致
,通常會使用螺栓進行固定之后形成一個固定間距的空腔,這樣就能夠保證使用模具生產(chǎn)出來的混凝
土制塊形狀大小都是一樣的。
The overall structure of the mold is relatively simple, and the design of the inner and
outer mold is easier, which makes it easier to demould during construction, and the whole
mold is durable. The pouring production of products generally adopts the method of cast-
in-situ. During construction, it is necessary to dig a large pit on the ground enough to
hold the mold, and then splice and assemble the mold in the pit before pouring the
concrete slurry. Generally, in order to ensure the consistent distance between the inner
and outer molds, bolts are usually used to form a cavity with fixed spacing after fixing,
so as to ensure that the shape and size of concrete blocks produced by molds are the
same.
安裝施工快捷,工期極短工廠一體化生產(chǎn),一次整體成形,施工現(xiàn)場一次性吊裝到位,半天即可完成
安裝,大大提高了施工效率,縮短建設(shè)周期,提高了經(jīng)濟和社會效益。占地面積小產(chǎn)品結(jié)構(gòu)緊湊,占
地面積小,實際占地面積為傳統(tǒng)化糞池的60%左右,節(jié)約土地資源。專利設(shè)計,抗壓強度高該產(chǎn)品外觀
為圓筒形設(shè)計,筒體兩端采用力學凹凸面設(shè)計制作。The installation and construction is fast,
the construction period is extremely short, the factory integrates production, takes
shape at one time, the construction site is hoisted in place at one time, and the
installation can be completed in half a day, which greatly improves the construction
efficiency, shortens the construction cycle, and improves the economic and social
benefits. Small floor area, compact product structure and small floor area. The actual
floor area is about 60% of the traditional septic tank, saving land resources. Patented
design with high compressive strength. The appearance of the product is cylindrical
design, and both ends of the cylinder are made of mechanical concave and convex surface
design.
模具加工機器操作:一個合格的鉗工應該掌握常用的機器操作,主要有銑、磨、車、鉆等。再就是飛
模、裝配技巧。師傅不一定講到或者不是正確的說法。比如:模具的技巧和角度、絲攻的用法、螺
牙孔的預留等等,其實書上都有詳細的介紹。多研究下書本上的知識,不懂的問師傅,一般一兩個月
,大部分機器操作就沒有問題了。
Mold processing machine operation: a qualified fitter should master the common machine
operations, mainly milling, grinding, turning, drilling, etc. Then there are flying die
and assembly skills. Master doesn't necessarily say or is not the most correct statement.
For example, the skills and angles of molds, the usage of tapping, the reservation of
screw holes and so on are introduced in detail in the book. Study the knowledge in books
and ask the master if you don't understand it. Generally, in a month or two, most machine
operations will be OK.