預制電力井模具作為鋼模具必須先進行拼接才可以繼續(xù)應用后,拼接的零件尺寸也要與模具一直不能有任何的誤差出現(xiàn),以免出現(xiàn)拼接程度達不到標準,組裝后的模具是兩層設(shè)計,在兩層模具中灌漿的部分開始涂刷機油,目的是進行模具的保護。我廠對于原料的選擇不僅是從質(zhì)量方面進行考慮,還有這模具的價格、使用時限、操作便利等等多方面,如果隨便選擇一種材料進行生產(chǎn),不能確保模具的灌漿效果達標。預制電力井模具是雙層的設(shè)計,內(nèi)層模具與外層模具尺寸有差別,在生產(chǎn)時需要分開制作。As a steel mold, the prefabricated power well mold must be spliced before it can continue to be used. After that, the size of the spliced parts must not have any error with the mold, so as to avoid that the splicing degree can not meet the standard after assemblyThe mold is designed in two layers. The grouting part of the two layers of mold is painted with engine oil to protect the mold. Our factory not only considers the quality of raw materials, but also the price and cost of the mold
In many aspects, such as time limit, convenient operation and so on, if you randomly select a material for production, you can not ensure that the grouting effect of the mold meets the standard. The prefabricated power well mold is a double-layer design, and the size of the inner mold is different from that of the outer mold
No, it needs to be made separately during production.